498.51
522.84
4.81

News

Road infrastructure in Almaty: two new streets to be completed by end of year

Road infrastructure in Almaty: two new streets to be completed by end of year
Фото: press service of Almaty akimat 12.02.2024 15:45 1175

The development of road infrastructure in the city of Almaty continues, since within the framework of the instructions of the akim of the city Yerbolat Dossaev, it is planned to complete the construction of two transport interchanges two streets by the end of this year. These measures are designed to significantly improve transport accessibility and reduce the traffic load in various parts of the city, El.kz reports.

One of the key points in the road construction plan is the interchange at the intersection of Seifullin Avenue and Zhansugurov Street, where it is planned to open traffic by the end of 2024. According to the press service of the akim of Almaty, this project includes the construction of two tunnels with a length of 690 meters, as well as the creation of 4 overhead pedestrian crossings, sidewalks and green areas, which contributes to the safe and comfortable movement of pedestrians and vehicles.

These strategic measures for the development of the road infrastructure of the city of Almaty underline its commitment to modern and efficient transport accessibility systems, which will ultimately improve the lives of citizens and provide more comfortable conditions for moving around the city.

Share:
Telegram Subscribe to our Telegram channel and be the first to know the news!